अपडेट
Visit: Ministry of Mines is organizing a national event to mark the Handing over of 100 G4 Mineral Blocks by GSI to the State Governments on September 8th, 2021, at 3 PM at New Delhi with FICCI 06/09/2021     | Geological Survey of India (GSI), under the aegis of Ministry of Mines is organizing a national event to mark the Handing over of 100 G4 Mineral Blocks by GSI to the State Governments on September 8th, 2021, at 3 PM at New Delhi with FICCI. Click here to register. 06/09/2021     | NOTICE Regarding Employment Fraud 02/09/2021     | “कृपया ध्यान दें: शेयरधारक ((ई-मेल आईडी और मोबाइल नंबर का पंजीकरण) 13/08/2021     | Global Tender Enquiry (GTE) for Engagement of EPCM Consultant for Establishing Facility for Aluminium Alloy Melting, Slab Casting and Flat Rolled Products Production Facility at Nellore, Andhra Pradesh, India. 10/08/2021     | Request for Expression of Interest for Lithium Ore Offtake from reputed Indian Firm(s) / Lithium Processing Technologist / Consortium from prospective mining facilities of KABIL and its international partners for import of ore/product to India 03/08/2021     | भारत के राष्ट्रगान के लिए अपने प्रस्तुतिकरण का योगदान करेंः https://rashtragaan.in/ 02/08/2021     | परिणाम – गेट – 2020 के माध्यम से स्नातक अभियंताओं की भर्ती 29/06/2021     | List of Shortlisted Candidates for Group Discussion / Personal Interview for Selection of Assistant Manager (Finance) – E02 Against Advertisement No 10200101. 10/05/2021     | List of Short-listed Candidates for GET-2020 Interview. 11/01/2021     | Recruitment of Doctors – 2020 12/10/2020     | NIT for Engagement of Consultant for preparation of EIA and EMP study to obtain EC to set up High End Aluminium Alloy project by “Utkarsha Aluminium Dhatu Nigam Ltd.” 16/07/2020     | Deposit of one time Registration fees for PRMBS 26/06/2020     | Covid Mailer from Ministry 06/05/2020     | Integrated Govt. Online Training ( iGOT) courses on DIKSHA platform on Covid 19 pandemic 22/04/2020     | Circular : Integrated Govt. Online Training (iGOT) courses on DIKSHA platform on COVID-19 pandemic 22/04/2020     | EOI – for SUPPLY, INSTALLATION, OPERATION AND MAINTENANCE OF GPS & GPRS BASED INTEGRATED RAKE TRACKING SYSTEM IN CAPTIVE POWER PLANT, ANGUL, ODISHA 11/04/2020     | Advertisement of PESB for the post of Director(Commercial) 18/03/2020     | The corrigendum against the Advt. no 10200101 13/03/2020     | आज माननीय खान मंत्री श्री प्रल्हाद जोशी की उपस्थिति में संयुक्त उद्यम खनिज बिदेश इंडिया लिमिटेड (KABIL) का समझौता खान मंत्रालय के अंतर्गत नालको, एचसीएल और एमईसीएल द्वारा किया गया | 01/08/2019     | 2019-20 के लिए PRMBS योगदान का संशोधन 02/04/2019     | अनुसूचित जाति/अनुसूचित जनजाति के उद्यमियों से विक्रेता पंजीकरण के लिए बुलावा 24/01/2019     | कें.सा.क्षे.उ. इंटरनेट के लिए समन्वय ज्ञान प्रबंधन पोर्टल के बारे में जानकारी 10/08/2018     | सार्वजनिक सूचना 26/01/2018     |
Press Release

NALCO and NINL to set-up JV for Coal Tar Pitch plant in Odisha

calender30/01/2017
DSC_0574
DSC_0587

Bhubaneswar, 30/01/2017 : National Aluminium Company Limited (NALCO) & Neelachal Ispat Nigam Limited (NINL) signed an MoU on 30 th January to set up a Joint-Venture company for producing Coal Tar Pitch. The MoU was signed by Shri S.K.Satpathy, General Manager (Business Development and R&D) and Shri S.B.Jagdale, Jt. Managing Director on behalf of NALCO and NINL, respectively in the presence of Dr. Tapan Kumar Chand, CMD,NALCO, Shri N.R. Mohanty, Director (P&T), NALCO, Shri K.C.Samal, Director (Finance),NALCO, Shri V. Balasubramaniam, Director (Production), NALCO, Shri B.K. Thakur,Director (HR), NALCO, Shri K.N. Ravindra, Executive Director (CS) and other senior officials of NALCO and NINL at the Corporate Office of NALCO in Bhubaneswar.

“The agreement is part of the new business plan of NALCO to ensure backward integration and sustain the plans for forward integration,” said Dr Tapan Kumar Chand. A Coal Tar Distillation plant is proposed to be set-up, under the JV, based on the Coal Tar generated from NINL’s Coke Oven plant at its 1.1 million tonne per annum integrated Iron &Steel plant at Kalinga Nagar in Duburi. NINL will be preparing a Techno-Economic feasibility report for the JV project