The 1st wind power plant of capacity 50.4 MW (2.1MW, 24 nos. WEGs) in Gandikota, Andhra Pradesh was commissioned in December 2012 and the 2nd wind power plant of capacity 47.6 MW (0.85 MW, 56 nos. WEGs) at Ludarwa site, in Jaisalmer, Rajasthan was commissioned in Jan’2014. 3rd wind power plant of capacity 50 MW (2 MW, 25 nos. WEG) at Devikot site, Jaisalmer, Rajasthan and a 50.4 MW (2.1MW, 24 nos. WEGs) Wind Power Plant at Sangli, Maharashtra commissioned in FY 2016-17.